Projects
Batticaloa Water Supply Project
BATTICALOA WATER SUPPLY PROJECT
- Client: Joint Venture with China Geo-Engineering Corporation/ NWSDB
- Date of commencement: September 01, 2007
- Date of completion: October 30, 2011
The project which was carried out in partnership with China Geo Engineering Corporation of China and Salcon Engineering Berhard of Malaysia included intake development, construction of head works, 26km length 800mm diameter water transmission main and 40,000 m
3 per day treatment plant.