CONSTRUCTION OF PROPOSED RING ROAD ALONG WITH WEST BANK OF WEST BEIRA LAKE
- Client: Colombo Municipal Council
- Date of commencement: May 15, 2017
- Date of completion: August 30, 2018
The scope of the project was to construct a 1.15km long four lane carriageways where the width of a single lane was 3.3m. The road was constructed along with a 1.8m wide footpath on the right side and a 0.75m wide footpath on the left side and a 7m wide two lane connection road connecting to the Galle-Colombo Road. The scope of the work also involved several soft ground treatments as some of the ground areas have previously been swamps with demolished road debris.