Design & Construction of Beira Lake Bridge And Associated Works For Waterfront Integrated Resort Development Project
- Client: Waterfront Properties Pvt Ltd
- Date of commencement: July 21, 2016
- Date of completion: December 05, 2018
The 35m wide and 50m long connection Bridge for the Waterfront Integrated Resort consists of six lanes with aluminium claddings on either side, flower troughs, high mast light towers and decorative lamps while the deck was constructed of pre-cast concrete slabs and in-situ concrete finished with asphalt concrete. The deck which rises from the side of Justice Akbar Mawatha, subsequently diverges into two key lanes which give easy access to the hotel development and condominium development.