Design & Construction of Ganemulla Flyover
DESIGN & CONSTRUCTION OF GANEMULLA FLYOVER
- Client: Centunion/Road Development Authority
- Date of commencement: April 20, 2016
- Date of completion: June 19, 2017
The design of the substructure, onsite fabrication, installation, and erection was subcontracted to AEL, along with the construction of approach roads and drainage works. The flyover was built on pile foundations and a seven-span steel superstructure along with 330-metre-long approach roads. The alignment of the flyover takes a detour from the Ganemulla-Kadawatha Road and links to the Ganemulla-Kandana Road, maximising the natural elevation of the terrain, improving the overall road geometry, eliminating land acquisitions and utility relocations.