Design & Construction of Gatambe Flyover

  • Client: Road Development Authority
  • Date of commencement: August 16, 2021
  • Date of completion: December 16, 2023

The proposed flyover will consist of two parts, a main flyover along the AB42 road and a branch flyover from AB42 road to A1 road along Peradeniya direction. The main flyover shall be 396.7 m in length with a minimum vertical clearance of 6 m over the railway and 5.2 m over the road and it will comprise a two lane carriageway. The branch flyover shall be 432.4 m long and it will comprise a single lane carriageway. The project scope also includes the necessary improvements to the junction and service roads to facilitate turning movements and through traffic along A1 road direction.

AEL’s scope of work includes the design & construction of substructure, on-site fabrication, the designing and construction of adjacent roads and installation & erection of the steel superstructure.