TOWN EAST OF COLOMBO DISTRICT WATER SUPPLY PROJECT – PACKAGE I

  • Client: National Water Supply and Drainage Board
  • Date of commencement: January 04, 2015
  • Date of completion: October 31, 2019
The project scope was to supply pipe borne water to an estimated population of 373,000 in the eastern part of the Colombo District, implemented through three contract packages. The contract Package I which was awarded to Access Engineering PLC included; supply and laying of 1000 mm diameter DI transmission pipes for a length of 4 km from Meepe to Meegoda and HDPE pipes of variable diameter as distribution mains for a length of 200 km.